Where we work
Service Areas Across The Triad
Now covering the entire Triad area.
Grading, demolition, land clearing and site work. Depending on project we may travel outside of our initial area.
Our service area
Where We Provide Our Services
Pick a town and the map moves to it. The distance shown is how far it sits from our home base in High Point.
Nothing on the list is more than about twenty-two miles out, so we can usually get somebody to a property within a couple of days.
Counties we cover
Cities We Serve
Guilford and Forsyth carry most of the commercial work. Davidson and Randolph are where the pasture and acreage jobs sit. Same crew either way.
Guilford
3 cities · North Carolina
- High Point
- Greensboro
- Jamestown
Forsyth
3 cities · North Carolina
- Winston-Salem
- Kernersville
- Clemmons
Davidson
2 cities · North Carolina
- Thomasville
- Lexington
Randolph
2 cities · North Carolina
- Archdale
- Trinity
In every town on the list
What We Do Across The Area
The same seven services everywhere we work. A job in Lexington gets the same crew and machines as one five minutes from home base.
For builders
Commercial and residential
- Building pads to plan
- Pond and SCM maintenance
- Parking lot subgrade
The rest of the work
Everything Else We Get Called For
Grading and demolition take up most of our week. These five fill in the rest, and they run off the same trucks with the same crew.
Land Clearing
Land clearing is taking off the trees, brush, stumps and undergrowth so a property can be used or built on.
Pasture that’s gone back to scrub, a wooded lot that needs a building site cleared, a fence line nobody can walk. We pull stumps out instead of cutting them flush, because a buried stump turns into a hole a couple of years later. Agricultural and properly managed forestry work is often exempt from the state erosion rules, and we’ll tell you if yours is.
- Trees, brush and undergrowth
- Stump removal and grubbing
- Pasture and field reclamation
- Building sites and fence lines
- Debris hauled off or piled on site
Site Development And Building Pads
Site development is everything between raw ground and a pad a builder can pour on.
Cut and fill to the civil drawings, subgrade prepared and compacted, access built so the trades can get on site, and drainage roughed in before anybody frames anything. We work to plan, and we’ll tell you early if what’s drawn doesn’t match what the ground is doing.
- Cut and fill to plan
- Building pads, compacted
- Parking lot subgrade
- Erosion control
- Utilities, storm, water and sewer
Erosion Control
Erosion control keeps soil on your site and out of the ditch, and above one disturbed acre it stops being optional.
Silt fence, straw wattles, inlet protection, check dams and stabilization. North Carolina wants permanent groundcover down within fifteen working days of finishing a phase, so seeding, hydro seeding and matting are part of the job. We keep an eye on all of it as the work goes on, because a silt fence that has blown over is not doing much.
- Silt fence and straw wattles
- Inlet and outlet protection
- Check dams and diversions
- Seeding, hydro seeding, matting and stabilization
- Maintenance through the job
pond-and-sem-maintenance.jpg
Awaiting photo from the client
Pond And SCM Maintenance
We build, clean out and repair ponds, and we keep sediment and erosion measures working through the life of a job.
Ponds silt up, banks slump and outlet structures block. We dig them back out, reshape the banks and get the water moving the way it was meant to. On active sites the same crew keeps the basins, traps and outlets clear, since a basin that’s full of silt won’t catch any more.
- Pond construction and reshaping
- Silt and sediment clean out
- Bank repair and stabilization
- Sediment basin and trap maintenance
- Outlet and riser repair
Hauling
We move material on and off site with our own trucks, hauling out what needs to go and bringing in what is needed.
Excess dirt from a cut, rubble from a teardown, brush and stumps off a clearing job. It goes out with us as part of the work instead of sitting in a pile. We bring material in as well, so a job that needs fill or stone isn’t waiting on somebody else’s schedule.
- Spoil and excess dirt
- Demolition debris
- Brush, stumps and clearing waste
- Material delivery such as dirt, rock, and mulch
- (hourly hauling)
Pricing, honestly
How We Quote A Job
There’s no square foot rate for dirt work that means much, and anybody publishing one is guessing. Here’s how we actually do it.
Somebody Comes And Looks
Every quote follows a site visit, where we assess site conditions such as soil types, access, vegetation and other existing conditions. No charge for the visit, and you’re not committed to anything afterwards.
You Get It In Writing
A written scope, a timeline, and a straight answer about what could change the number. You’ll see what’s included and what isn’t.
Surprises Get Talked About
Rock, ground that won’t compact, an old foundation nobody knew about. If we hit something we stop and call you before carrying on, so it isn’t a surprise on the invoice.
What moves the number: how much ground is being disturbed, how far material has to travel, what is underneath, whether spoil leaves the site, and whether the job needs a plan or a notification first.
FAQs
Questions About The Work
Do I need a permit to grade my land in North Carolina?
If you are disturbing more than one acre on a tract, yes. The state requires an approved erosion and sedimentation control plan, submitted at least thirty days before any dirt moves and approved before work starts. The state review fee runs $119 per acre or part acre.
Under an acre you usually do not need a plan, but you are not unregulated either. In High Point, for instance, every grading site regardless of size has to take reasonable measures to keep sediment off public and private property. Which office you deal with depends on your town, and there are six different authorities across the ten towns we work in most.
How soon can a demolition start?
Ten working days is the realistic floor, and it is set by the state rather than by our schedule.
North Carolina requires a demolition notification to the Health Hazards Control Unit at least ten working days before the machine touches the building, and it applies even when there is no asbestos present. The building also has to be inspected by a state accredited asbestos inspector first. We file all of it, so the sooner you tell us the job is coming, the sooner that clock starts.
Do I really need an asbestos inspection on an old house?
Yes. North Carolina requires an inspection by a state accredited asbestos inspector before any demolition or renovation, regardless of the age of the building or what anybody expects to find.
A local demolition permit doesn’t satisfy the state requirement. They’re two separate obligations, and mixing them up is how a lot of residential teardowns go wrong.
Can the same crew do the demolition and the grading?
Yes, and it is usually the cheaper way to run it.
A teardown and the grading that follows are two mobilizations if you hire two outfits, and the second crew inherits whatever the first one left behind. We do both, so the machine that takes the structure down is the machine that shapes the ground afterwards. One quote, one schedule, and nobody arguing about who was supposed to deal with the foundation.
Not Sure Which One You Need?
Describe the problem and we’ll tell you what the job actually is. People often call about one thing and it turns out to be something else.